In the section of the US has some problems that must wait for a summary from the owner (internal pipe of the same level, because the heating) according to an attached document.
In the model, we have some issues that need to be finalized by the project owner. (Pipe inside the heater because the same level), according to the documents attached to it.
In the model, we have some problems to Ross summary from the owner (pipe inside collide with heating because the same level) series, according to documents attached to