National Stadium in Beijing. As a main stadium used in the summer Olympic Games to be held in Beijing, 2008 China construction began on December 2546 scheduled completed in 2550.Herzog & DeMeuron (Switzerland) and China Architecture Design Institute (China Architecture Design Institute), covers an area of 258000 square meters and has a capacity of 1 hundred seats using the budget to 3.5 billion Renminbi? By this stadium will be used as the field athletics and football. The stadium is located south of the Olympic Stadium in Beijing by open, include area of 23.7 Hector, for use in the opening - closing and competition of track and field sports and the Olympic 2008 by a capacity audience of up to 100, the 000 people. Divided seat, permanent 80 000, extra seats, and 20000 (take out at the end of the race), within the main Olympic Games 2008. This field is used as a field or international activities in other sports.
การแปล กรุณารอสักครู่..