To Estimate Man Hr
1.Staff MFG plans according to the PC on a PC, according to a summary of the total Est.
2.Report Line on the Daily chart, the report notes that the Plan is based on the separation Process based on the model of STD by supplying manpower to the opportunity to make a difference PC STD Plan 2.1.
. With เปลื่ย naplaeng
2.2. Appearance of WIP Est. The Production O/P version does not match that set
.
การแปล กรุณารอสักครู่..