Information: Bua Tong Doi Mae U neck. He has a wide coverage area of about one thousand hectares are the responsibility of the Forestry Development Unit at the 5th Division of Watershed Conservation. Here, when the lotus bloom simultaneously. During the months from November to December is the golden cover the entire mountain. Very beautiful
location: Rural Roads M. 4009 District Yuam, Mae Hong Son
Open - Closed: Open every day
of the trip: Route 108 (Mae Hong Son - Yuam) prior to the district about 1 km turn left on the highway. Late in 1263, another 26 kilometers into the Bua Tong
Open - Closed: Open daily.
การแปล กรุณารอสักครู่..
