The production is increased, while the frequency of wash basin (wash every Monday-Wednesday-Friday, but in the basin, CV 2. Wastewater and rinse every day).
With increasing frequency, while filling production in wash basin (current wash every Monday - Mercury - Friday, but in the basin CV2 release water and wash daily).