Before the plaster must be cleaned and the water, the surface of the plaster layers, uniform moisture content and then the second layer plaster as the first layer.
Prior to cleaning, coating And water to the surface of the plaster on the first floor with consistent moisture. Then a second layer as the first layer of plaster.