This project would not have succeeded if it had lacked cooperation from everyone, so.I would like to ask for cooperation from everyone to attend the meeting to find a way to protect. Process improvement, improved to reduce the defect from the production line through QC engineer will be a leader in the project and time-based breakdown by:Hope to get cooperation from all of you as well.
การแปล กรุณารอสักครู่..
