For a pond that we see a concrete pattern bok to time to pour concrete to pour the concrete and the rest coming this spring will be removed. When it came time to lap five months left Based on the location that is specified for the mesh. Through the dust trap factory, piles of rocks, piles of sand and a part in the standardized.And here is another standard that water cannot flow out into the pond, he is quite old, haha.
การแปล กรุณารอสักครู่..
