Surface runoff water quantity in this section will thukrabai into the water table and flow as well as the concrete into the well after it is pumped out and get rid of saraburi cement factory.
Surface runoff in this section is drained into the gutters around and flows into the concrete after it will be pumped out and dispose of the cement plant in Saraburi province.
Surface runoff in this section will be drained into the trough water drainage including steam and flow total around into the concrete tank after the smoke and waste in cement factory Saraburi province.