Development of a water turbine, turbine Chai to wastewater treatment. How to rotate a spinning air, polluted water is becoming fill itself to develop a water butt can I apply wastewater treatment from public goods. Waste water from industrial plants, as well as adding oxygen to the pond aquaculture products. Finish development of the turbine was created to solve water pollution which severity in many areas the evolution of turbine development of the victory. The prototype is the first time in a year, then installing the 2532 (1989) space try to solve the problem. His Majesty he conscious suffering tribulation that happened this His Royal Majesty has deep fried natretphap waste water in many areas, many times both in the Bangkok Metropolitan area, with a mixture of thanop RA about polluted water damage. In the first phase-2527 (1984) 2530 (1987) recommend the use of a water tank with good quality water, waste, and how to help filter waste water with vegetables. Topchawa and various water plants that can help resolve the problem in one level.
การแปล กรุณารอสักครู่..