In normal conditions the dam wachi audit organization into paradise nami dam behaviour, such as the movement of the groundwater in the damage to the production system using the automatic measuring system and manual systems.
In normal conditions the dam Wachira down device monitoring behavior such as dams throughout the movement collapsed damage in use. To support system The monitoring system is automated and manual.