Details about the production and delivery of the bottle PET 150ml
PO to produce the latest and 100 000, Pcs.
1. Standard. Lead time in the production of plastic and is 30 day
2.PO has recently on 29 / 1 / 2558 which specified period to a 3 / 9 and / 58 9 / 2 / 58 The Mala plastic can not produce Tan
3.? The Mala plastic keep Minimum Stock for bottles, PET 150ml 50 000 Pcs.
4. Minimum Stock luggage number, 50 000 Pcs.This modality has sent with plastic PO earlier, in which to Minimum Stock, Mala plastic to keep walking until PO after all!
การแปล กรุณารอสักครู่..