And should the length tolerance, because the parts may be damaged before or after it. Therefore, if the duration Figure 14 provision for too much or too little it costs or damage occur.
And should set the stage for The components may be damaged before or after the above Figure 14, if the period for too much or too little, it may be wasteful or corrupt them.