The wastewater from the production line. 2
The wastewater from one activity) from neutralized. (Neutralization) is split into a sewage system, evaporative drying of a second production line to separate salt water and sediment out. It is designed to reduce the volatile matter (Total Dissolved Solids) in wastewater (sewage system. The first production line has a designed water treatment systems, evaporative dry. Can not install a septic system evaporative dry) by evaporated water is condensed and circulating the water to be reused in new units neutralized. The waste water from one activity) lower unit (Washing) to 3) and 8) will be sent to treatment to the sewage system of the two production lines to adjust the pH value. And treatment to meet the Hemaraj Eastern Industrial Estate (Rayong) set before being sent to a clarifier effluent (Wastewater Hold Up Tank) and sent to landfill inspection (Inspection Pit) and then sent to the central wastewater treatment. of Hemaraj Eastern Industrial Estate (Rayong).