5.2.2) to improve the state of the active area
* Should install the ventilation mechanism. Fill the air to sufficient and appropriate and ventilation rate "Air change" will be defined and designed according to the standard H.M.3010 and standard of ventilation and air conditioning of America or "ASHRAE"
for the installation of refrigeration system may not be suitable for building use
this kind of work. Because of the space segment
.Big zero parts or warehouse is used to collect materials. The
temperature conditions that do not exceed 45o
C will not affect the material storage.
so equipped with cooling system. Not only the cost of
.High investment, but also is a waste of energy used. The benefit is not worth much
.