Yarn preparation equipments include
1. Of the lot, the Vinh Tan (or lukkhan)
2. Rails core pressure pressure fim Ta stand on (the hook into the fim)
3. A Deputy steps into practice balls fim (or Rahat) to send the time thread woven
4. Wood strikes is to fast forward to polishing wooden thread (or crutches)
5.
Thread roll machine- A weaving loom or contains
1. Fim (comb teeth)
2. He loom (tako or KRA-)
3. Shuttle
4. Wangkrasuai
5. Wood wool roll axis
6. Fabric roll master
7. Lever pedal (foot pedal)
8. Laikratuk (rope pull)
9. Bottom thread
10. Fling yarn tube
11. Rahat next thread
12. Tanks and other equipment from the weaving machine. With Niagara Falls shuttle travel spinning and spinning wheel Standing in an old thread knitting Rahat Thai's inheritance from their ancestors, should be up to promote and preserve the remains with the Thai national.
การแปล กรุณารอสักครู่..