I've reviewed all of its schedules, HOWA (THAILAND)Because the NC machine, we have only one Machine cannot be brought up at once.And the Processing steps, from the schedule to wait for DATA to drill there. Link as well?
I have summarized the entire schedule of HOWA (THAILAND) because the NC we only have one so I can not put up Machine simultaneously and scheduled procedure Processing must wait DATA to itemize it is connected or not.