Enable all locations. The water is waste water treatment from waste treatment method, which opens the show, and the hills of garbage is not fixed until approximately 20 after starting the operation.
Enable it to every area. Also sewage from waste water treatment method, which opened the show. And also the subsidence of the waste until the static takes about 20 after the operation.
Activate all area. Treatment of waste water, which is also open to show how treatment. And also the settlement of the mounds of trash until constant, approximately 20 after the start.