The area along the railway project to double the Chumphon - Surat mainly land use categories agriculture, including the cultivation of perennial fruit growing cultivation and rice respectively crops, including rubber, rice oil. palm and fruit are also some areas where land use is with aquaculture. The land use types of urban areas and buildings are concentrated intensively in the area surrounding the station, including the station in Surat Thani province. In other areas The land use types and community buildings with light. In addition, the trail continues through the forest rather than with
the network: a double track railway project. During Chumphon - Surat The rail line will enhance the communication network linking the Bangkok Metropolitan area to the south, with easy access and a more complete. Due to the current route, the trip will take Highway 4 (Phetkasem) is the main route of travel. The road to such problems as traffic jams have been traveling the entire distance. And travel distance (Within the area), the construction of a double track railway. During Chumphon - Surat Adds the option to travel on its network to the public. It also solves the problem of traffic jams on the highway route, with
double track railway project. During Chumphon - Surat One of the plans is the development of the railway system, a second phase to improve the construction of the railway station in Chumphon. Surat Thani station From a single to a double. To accommodate the volume of travel To improve quality of rail services. And reduce the cost of passenger travel and freight transport in the southern hemisphere. The development of a rail During Chumphon - Surat In addition, as part of developing the rail network southern counterpart. (Bangkok - Chumphon - Sungai Kolok. And Padang Besar) in accordance with the development of rail and high-speed trains to the Ministry of Transportation has studied. Including accelerating the implementation of urgent infrastructure investment plan 2553-2557 as approved by the Cabinet on April 27, 2553 but it also represents an important and encouraging other developments. Success as a part of the railway line linking southern China, and Singapore. Economic Corridor and the North - South (North-South Economic Corridor) region support the development of commercial doors in the Deep South. The Pak Bara And the second port of Songkhla, because the route will link South and other regions. This will push the country's development and international trade. As well as enhance the logistics hub of Thailand in the ASEAN
concluded. The dual rail project During Chumphon - Surat The network is appropriate. The connection to the road transportation network. Local community level and at the provincial level. In response to the need to diversify agricultural production and local industry. Demand for travel and for other purposes. To other regions of the country effectively. As well as a network that can connect to the border between Thailand and Malaysia to link international shipping by Economic Corridor North - South (North-South Economic Corridor) in the future.
การแปล กรุณารอสักครู่..