1. the work plan development, infrastructure, and community organizing.1.1 Agriculture water resources development construction of the reservoir system with 5 water into agricultural areas, along with digging pools in farmland and dredge the Creek periodically.1.2 development infrastructure construction dirt road Tarmac road and concrete roads in the areas converted arable land and a residential conversion. Construction of electrical systems, plumbing systems, long-distance telephone, via satellite, built a 30-bed hospital, 1 bed, 1 high school, 2 elementary schools, hotels, educational centre outside the small child development center, 1 school, and measured 4 properties. 1.3. the residential conversion and converting arable land, people. By implementing convert to residential and commercial buildings in total, number 1,146 convert area, 1013-12-61 acres and arrange plots in areas of water reservoirs, five by converting space 8 space, the number of acres converted a total of 906 7,248 acres.
การแปล กรุณารอสักครู่..
