Abstract.Of project management development and the process of withdrawing Supply Depot A case study of Hat Yai railway station. Aims to reduce the time to search for procurement and distribution package. And to reduce the error caused by the work 70 percent error of the current. Step by step in project work starting from the warehouse. Collecting data to analyze the problem in the warehouse After that, the plan and design layout, parcel sorting priority of the parcel. The storage and application of out used also create programs in storage ware. Which before the experiment program must continue to clean storage space and arrange delivery according to design completed so. Implementation and improve the defects and the application to actual use. Which operation or planning to bring the various theories used. By the results can answer the purpose that can reduce the time of the original were 74.1, and can reduce the error in the recording of 100 also manual program designed for use in the storage system, a parcel of repair hangar Trailer. Hat Yai railway station.
การแปล กรุณารอสักครู่..
