Khlong tha ngio reservoir project. The head of the dam the Canal, THA ngio. Located on a canal, THA ngio In the district, Tambon Khlong tha ngio district, Trang province.Construction period of 7 years (2537 – 2543) 18.50 million cubic metres capacity. 1. to use as a water source. 2. to use as a source of water for sanitary purposes – consumer.3. to as a sideline 4. to increase the richness of the forests upstream. 5. in order to supply water to the soil for future district's plumbing.
การแปล กรุณารอสักครู่..
