For testing, we used truck based on Monday figure below
by the location, scale หนักร, able to be used for testing the water before start. We can find the load. By means of weighing with trucks, removed with car body weight
.For rock blasting. Today, the mine is inevitable because of the equipment damage, delayed from the original explosion 4 postpone a 8 makes recording for the difficult.
การแปล กรุณารอสักครู่..
