Open area for ventilation splint splint is dry within 24 - 48 hours, do not place a splint leaning on a hard edge. Or walking down the full weight After that requires crutches.
Open area into a plaster cast, airy plaster cast will dry within 24-48 hours, do not place the plaster cast or on the edge, you don't lose a full weight. After that prop.
Turn on the area in an airy bamboo strips, bamboo strips are dry within 24 - 48 hours. Do not put a banner on the edge of the hard or walk down the full weight must be used after the poles against