Project study Study on improving methods of work, to reduce the time it takes factories to produce drinking water. Is intended to analyze the reasons for the delay in the working and storage tanks for drinking water, clean work. And establish standards in the production of drinking water from water tank isolation procedures to clear water tank packed drinking water to CAP's scene. Steps to perform studies consist of (1) a preliminary understanding of the factory (2) Propose solutions and improvements (3) data analysis and comparison of operating results before-after adjustment (4) summary of results. From these data, researchers have taken the hypothesis generated by solutions tool remove activity. 5 h 5W 1H used in analysis and problem solving for ECRS.
การแปล กรุณารอสักครู่..