Because the provincial electricity authority, amphur Thalang, It is necessary to abstain from power temporarily to perform the high-voltage side by day, time, and location in the following ways:Therefore, You will no longer have power temporarily on the above date and time and do not work in any of the principal bat electric distribution systems by any electrical power may be due to the timing. When the task was completed, and apologize for any inconvenience this time.
การแปล กรุณารอสักครู่..
