Dig a pond cement operation. side, building capacity for integrated and Tai buildings waste water at the same time, it has to install a pump to pump the waste type, float into the path tubes to treatment in wastewater treatment plant of the company further. Current construction and pump installation has successfully completed when the image attachment 2558 (2015) August 14 below.