Focusing on process improvements
and scheduling of employees and machinery of the mill case studies
from the education process and how to work the case industry with the tools, education, mobility and include diagrams, flow (Flow. Diagram) manufacturing process (Process Chart) and
activity charts, multiple (Multiple Activity Chart) analysis of problems in the manufacturing process using 4M (man machine material and method), and the loss of 7 points were the main problem is the employees. fatigue in the workplace. Impact in the case of milk improved by adjusting the position of Vice basket skeletal milk. To shorten the outreach arm of the milk in the packaged milk. This reduces the operating time of 24 minutes per day, the problem of dividing the workload among employees with improper equipment can solve the problem by scheduling the machine. And a more balanced, you can reduce the number of employees has two people to reduce waiting time and increase efficiency in
the functioning of the milk is pasteurized sachets. 36.67%
underlying principles Dairies For Dairies small denominations (1) the distribution function of the employee as
appropriate (2) Production (3) condition monitoring equipment and systems of manufacturing processes
(4) to monitor the temperature of the room temperature (. 5) The quality of the milk is pasteurized and
(6) the recording process.
การแปล กรุณารอสักครู่..
