For the fiscal year 2556. plan/budget for construction, building a water main line Canal forced gag some more. 3, which will make it possible to turn off the main line Canal project, covering an area of attaining the number 9 line and part of the municipality of sub-canals rose to carry itself. To prevent the water from the river inflow into the Canal to flood homes and agricultural areas. During the months of August to December, and during the river is at normal levels, it could open the door for drainage, benefit from the water in the Canal and boat traffic to help the cultivation of sideline and help alleviate flooding that often occur during the winter, water. By a majority of representatives career cultured orchids. Fruit trees and ornamental trees and field crops
การแปล กรุณารอสักครู่..