A practical control system) standard 3 standard system, all in accordance with the annual work plans and reduce NC received from an external assessment to 50%
B) to receive awards from the Department of industrial CSR-DIW .
A) operational control system standard on all three standards consistent with the plan. Annual NC and reduce the amount received from the external auditors to 50%. B) leading to the award of CSR-DIW DIW.
A) control the performance of the whole system 3 standard standard system in accordance with the plans for the year, and reduce the quantity NC received from external audit into the 50%