Disturb confirm, carriage of goods, details as follows:
1. Confirm registration, drag head ID drive and mobile number. Please
2. Plans to go. Load products on Sunday 20 Dec 58 time 08.00.
3. Shipment to KAO Monday 21 Dec not exceeding 16.00.
4.Prepare Adaptor used load products at the factory.
5. If a new driver, please inform the contact to load goods KAO. .
การแปล กรุณารอสักครู่..
