To make the system and MIS/EIS GRC policy business continuity management (BCM), of salak, which Office objectives that are defined so the operation scope. As follows:1) analytical study of the system currently in effect in the migration process (System Transition) using Software Virtualize the budget and operational plan. 2) preparation of the host computer system architecture, Virtualization Architecture.3. transfer system) work on the Physical server, Virtual Machine (P2V) on a host computer system. 4) preparation of High Availability features provide a mechanism for both systems (Applications), and makes the system host computer (Hardware)5) analysis and evaluation of all actions in terms of features and performance of the system.
การแปล กรุณารอสักครู่..