Study results showed that the algorithm can lead to development of a system of traffic lights, automatic electrical control contract, applied with a real time GPS data.
The results showed that the algorithm was able to develop the electrical control system contract by traffic lights automatically applied, along with a GPS real time.
The results showed that the algorithm can be developed to be an electrical control system of traffic lights contract automatically applied with the data. GPS a real time.