HistoryBTS is a system that operates separately from the. MRT — caused by the approval of Bangkok, Thailand. The army's model SI mueang as Bangkok Governor, because at that time in Bangkok, there are no mass transit system on Rails. A study on the system construction projects, such as the Skytrain system, several subway la Wah Lin, but tend not to approve the construction of the Cabinet while the traffic jam in Bangkok because of heavy vehicles increased as a result of liberalisation, new cars can be imported from abroad. In the Anand Panyarachun Government (previously. New cars are imported from abroad. Taxable import up to many times the value of the car) [citation needed]Later, Bangkok approved the construction of the concession and the bus companies. Thana Yong co., Ltd. (present company is BTS group holdings public company limited) of Kiri Kanchanaburi phat at first assigned to create a garage, maintenance area, lumpini Park. But the people who use the area to lumpini Park to exercise on a regular basis include the protest access areas that contrary to Royal intention of his Majesty the King Phra mongkut Rama that Royal Decree to reorganize thanop estate as a public park. There is also a protest to change the format to create the elevated rail structure as underground tunnel, sky. In the end, it is moving maintenance dock construction site to use that application results of Treasury, which is the original and the Northern bus terminal (MO chit station) near Chatuchak Park by during the first open. This line trains use electric car called thana Lyon [2] by the name of the company that received the concession.Currently, BTS is under consideration by the Ministry of transport and communications and the Ministry of the Interior. To transfer trains from all parties as a concession and property of Bangkok into a property of mass transit instead of Thai national [3] Because the Transport Ministry considers inappropriate Bangkok to take care of big projects, it may be the problem. Also, clean your car in extension of the MRT Sukhumvit line mass transit of Thai will not use methods that employ BTSC to perform, but will use a PPP project bids the same Gross-Cost MRT. The purple line, which may occur in case the provider may no longer be BTSC and the increase of the State to control fares and draw together that there will be no entrance fee as well. However, the Director of the Bangkok Metropolitan Administration has decided to be hired to walk to BTS mass transit system in Bangkok, a 30-year contract to replace the bus contracts will expire on May 7, 2012 and August 11, 2012 [4] which causes suspicion from the members of the.Koprarok to Thai Government party at that time, [5] and response from Democrat party member. The main opposition party, the issue is about, or lose the benefit of the Government and the people's interests have been damaged, or chaokrungthep, Bangkok, this story makes the BTS group holdings public company limited. Subway operator chalerm Phra Kiat flyer distribution is allowed inside the stations, railway station as well. It is the first time that a dialog that is cooperation between Bangkok and the BTS group holdings public company limited [6] to the result and consequences of this interaction is the Government party to the Department of special investigation to put on hold outsourcing within Metro mass transit system in Bangkok for a period of 30 years, [citation needed]
การแปล กรุณารอสักครู่..
