This project is a study on the improvement methods of work in order to reduce the time it takes to produce drinking water. The analysis aims to identify the cause of the delay in the working and storage tanks for drinking water, clean work. In order to improve the production of drinking water, and speed up the standard in the production of drinking water from water tank isolation procedure to clear the water filling water tank installing the CAP's scene. The steps to perform the study, consisting of (1) a preliminary study of the plant (2) preliminary data analysis. Propose solutions and improvements (3) data analysis and comparison of operating results before-after adjustment (4) summary of results.
การแปล กรุณารอสักครู่..