The process first PPA
-
40000 Coordinator). The operation document with a certified a permission, electricity 60 000%
cost back from PPA
- the coordination agent. In the local and the rental contract, land, 3 960000)
- permission building (District), 1 127 000)
- letter of approval from the Tao to operate the electrical, 67 000)
-. Permission to operate factory / expansion 136 500 baht,
-. Ask permission to engage in the business of renewable energy, electric 56 000)
.- allowed energy control, 51 000)
-. Permission license, electricity, 145 000)
- license, BOI 173 200)
- design value after getting PPA (1.5% of information job)
(1 Mw. @ 60 000 000,,))
(5 Mw @ 300 000 000 baht),,
.