The report is the front installation storage
on 9 / 07 / 2015 grand company, said that is was the pole with the beam, as in the photo attached by a cable.After this, the paint primer. All the pieces come in and delivery date. 14 / 07 / 2015
learned to know.
การแปล กรุณารอสักครู่..