Monitoring and bug fixing of electrical equipment
first. Monitoring and debugging systems and electrical equipment in building
two. Monitoring and correcting faults of transformer
monitoring and debugging systems and electrical equipment in building maintenance (maintenance) must be continued and each time repair. Should you create a full service history for the sake of analysis and prevention in
the future. Monitoring can be divided two ways:
1. Check with your senses. Check the condition of electrical equipment by voice or touch, smell, see
2. Check with a test tool Most use a multimeter Makers Insulation tester meter or meter resistance grounded. Monitoring tool, one that can create applications with a simple method over time. Pour Slam sites
using only Slam Camp is a testing
circuit breakers force of less
than. Circuit breakers first phase consists of CB 1 terminal with container load center (Load center) is applied to the system. 1st phase
b. Circuit breakers third phase will have three terminals (3 Pole) CB series are used with three-phase
(a) 1 Pole
(b) 2 Pole1.
The check circuit breakers.
1.1 Monitoring the mechanical system
test by pressing the reset
1.2 Monitoring of contact and insulation
in. Touch screen test
to check with a multimeter contact
information. Dielectric test
to verify the insulation multimeter with
two. The maintenance of circuit breakers
first. Connector of the circuit breaker
on. Connector loose or
b. Scorch marks from the arc. Point or not
smoke. Let's fly The polar impurities such as dirt in
two. Contact
g of contact with moving parts that are close to each message. When exposed to each The resistance must be zero ohm
3. The general condition of the installation and clamping
device. Have strong corrosion
b. Vice firmly attached to the keyboard. Do not loose the insulation of electrical cables
1. Why did North. The insulation deterioration to
1.1 temperature
1.2. Insulation wrapped joints bad
pass too much current flow, 1.3
g. Line too small
b. Installation of additional equipment But the same size line
c. Fitting prevent inappropriate
1.4. Cables being crushed
1.5 quake
loose joints 1.6
1.7. Lack of monitoring and maintaining the
two. To check the insulation of electrical wires
before. When the control circuit - Turn off electricity to the Makers. Electrical wiring with insulation tests on cable tie
first. The resistance of zero or less than 0.5 ohm insulation deterioration Meghna
2. More than 0.5 ohm impedance Meghna has not deteriorated insulation
b. Tubes with 1,2 points, then check the insulation between power lines with ground
first. The resistance of less than 0.5 ohm insulation deterioration Meghna
2. More than 0.5 ohm impedance Meghna insulation has not deteriorated
2.2. How to test insulation on wiring of power lines
, electrical conduits in Figure 10.8, the insulation of electrical cables. When the electrical wiring in conduit
g Makers or use insulation tester meter pole test any
message. Test the soil grid with
three. To the maintenance of electrical cable insulation.