Reference to the Key Performance Indicator of the MRT project, Apportion the purple wire is set to Non-Technique, which is the damage caused to the environment or a third party that has been configured with KPI stood at 0.10%, details as follows:1. the damage caused by a collision with the vehicle structure.2. damage caused by the earthquake.3. damage caused by water erosion and natural disasters from the rain.4. damage due to terrorism.
การแปล กรุณารอสักครู่..