The problem of water leaking from the structure when it rains. It is a difficult problem to fix, and then finish it. It now also beginning to seep into the water was not found at all. The cause is thought to be carried out at any time resolve to 2-3 months. The rain fell steadily since summer. It can not be dismantled by a mortar opened the floor to the roof, making inter completed. Be done during the dry season And achieved continuous take 3-4 days
, however. Understand the problems suffered And safety And monitoring By bringing it from you. Report a problem Since the end of last semester,
so the plan was to dismantle the concrete block and back to work on ensuring that it does not rain during the operation. And not disrupting the class when I made the Gaa. Defined by a range of 17-20. The 59th now.