I propose to add budget in a 25000/month.Detail is the installation location 1 month period and shows the A6 at the mobile location IM5 1-month (carousel with customers).
I propose to increase the budget down. 25,000 / month is detailed Next to the A6 at 1 month and presented at the Mobile IM5 period 1 month (rotating banners with other customers).
I offer a budget increase in down, is 25 000 / month.Details on A6 1 month period position and show the mobile position IM5 period 1 month (rotary label with another customer).