This research aims to optimize the working mobile fruit shop. Steps to start working from a mobile fruit shop with most sales statistics came from the study of methods of work, break down, and the standard time using the micro motion studies and Economics movements so it doesn't cause a wasteland and using video applications.ECRS ราะห์ for guidelines and improve the work more efficiently. I found that the main micro-motion and movement of rotsat chips, fruit store, the mobile has a wasteland in the works, along with proposed guidelines updated with the ECRS principles result from improvements in sourcing, fruit, 1 ball until sent to the customer with the original 64-step step step 21 reduced time-0.465 seconds, time remaining, down from 0.23 seconds.
การแปล กรุณารอสักครู่..
