I found tons of water pipes in NICs, which are the responsibility of the building. 5 at the ground floor, then quickly make corrections. Because the insured had not come across this problem before.
found that see the water ton the pipe Eliezer, which is responsible for the building's floor area is 5 bundle modifications. Due to the insured has never come across this problem before.