Tier 1
1. Install the fence in
front of the entrance wall, smashed 2.
3. Front cover
4. pounded up the stairs to the bathroom,
tiled bathroom 5.
6. smashed the kitchen wall outlet
7. tiled floor corridor. the room
behind the restaurant annex 8.
9. ceiling downstairs rooms
10. 4 series Kitchen
sinks, two sets of 11. do
the light fixtures on the ceiling 12.
13. move the tank water
pipe 14. water supply
การแปล กรุณารอสักครู่..
