Studies investigating solutions to supply asphalt is not enough case studies Tipco Asphalt Public Company Limited (Thailand) aims to fix the purchase of asphalt that was not enough, and shorten the time to purchase asphalt, which. The company's main raw material The asphalt material And predominating The risk of fluctuations in oil prices in the world market. As a result, problems Which comes from the company's procurement process. The need to obtain tires from foreign refineries. The reception of asphalt each day are not equal. On some days the demand is more commonly used. The study on the operational plans of the purchasing process a long waiting period. This has led researchers to use the theory of lean procurement process. To help reduce and eliminate unnecessary steps. And the process does not cause worth. Or wasteland What happens to go away As a result, operational processes more efficient. Reduce costs, meet various customer needs. Both inside and outside the organization Effectively
by conducting research, can lower operating procedures and timing of this process improvement. By reducing process waste. Such as the authority to approve the purchase approval. This can shorten the time to order it.
การแปล กรุณารอสักครู่..
