This research project aims to prang Assembly process air conditioning split (split type) so that the deposition increased work and respond to the needs of the Department include air conditioning. By making an analytical study of the work processes (process Flow chart) and a flow diagram (Flow diagram) has been designing and improving. Where others tools and equipment to help in the work. As a result, time pieces, air conditioning, Front lower panel. Remaining from the original minutes 2.69 seconds 3.96 production rate increased from the original piece 323 per day increased to 412 pieces per day.