Spurs travel to travel into angles. Do not use hit a smash are missing. If you're connecting the horizontal demarcation line Do not plug in the center of split. In addition to a completely bangbai and corner joints are the same skin. For installation of justification to use the slack rope wall test successfully, and alignment of the wall, wall, wall structure with neat cement mortar or before based on the concrete wall, the distance does not exceed 400 mm before stamping, punching the clock and send the headers before the nail surface is level with the wood well, except where stated otherwise.
การแปล กรุณารอสักครู่..