The agreement to employ the TUF (the next is called the contractor) to perform the study, design, water Reuse system installed production capacity of 50 m3/h (Water Reuse through filtration) system requires new engineering systems, including the contractors will be required to supply material to the extent set forth in the terms and conditions of this quotation. If there are any other sections involved and sequel. The contractors will be required to supply what the relevant demand of success. TUF, Assembly, installation and testing machinery, tools and equipment, materials and details of all these terms throughout the tasks involved, which may not be shown, but need to do so that the water Reuse system and piping, and then successfully works until the etiology of various recognized standard of the relevant authorities.
การแปล กรุณารอสักครู่..