Now, the area around the junction pipe repair face bank Phayao
.Attached device in the connecting pipe to ensure that everyone will be able to use the water within 1 hours เป็นอย่าง slow (when the water flow in the beginning. Turbidity, or may be due to the water that freezes within the color repair partial)
.The waterworks in Phayao. Unfortunately in operation urgent repair pipe). The bow in the criticism from all of you. For the development of the service to the water users next
.
การแปล กรุณารอสักครู่..
