The purpose of this research is to study and determine how to work a standard. To the quality inspection department, clothing.
, using techniques of motion and time study
.To study the problem and find ways to improve the working method as the standard
.In this study, the record data. And analyze the processes and activities in the process flow chart and the chart of people - machine. The application of the principle ECRS
in finding ways to improve the working method
.After the work study and formulation of standard time and improve working method in practice.
the quality inspection department, clothes can increase the number of clothes that check.
from the original time standard of 233.43 seconds / piece down to 143.60 sec / piece.
, and can increase the amount of clothes inspection from the original 774 pieces per day increases, 1 206 pieces / day. According to the target of the company
which specified is not less than 1, the 200 pieces / day
.And increases efficiency from the original 52.16% is 54.44%.
การแปล กรุณารอสักครู่..
